Time Lapse Photos

In this large time-lapse, watch the dam from the time the "shave" (cutting down the top of the dam) was complete in early October to the dam had been topped at an elevation of 521-feet and work began on placing "riprap" on the reservoir-side of the dam.

Also, notice the construction of a new wall at the corner of the dam that will extend all the way across to the spillway, located on the right.